Return to SPUR Projects Summary
Return to SPUR Projects Home
Return to SPUR Home
|
Chapter Room Renovations
The Chapter Room will be getting a complete face lift and needed
repairs as part of SPUR.
- The drop ceiling will be removed. The crumbling ceiling above it
will be restored.
- The faux wood panelling on the walls will be removed. In its place,
will be finished wallboard with wainscoting on the lower half of the
wall.
- The tile mosaic around the fireplace will be restored
- The currently broken fireplace liner will repaired or replaced.
- The parquet flooring, as in the rest of the house, will be replaced
with hardwood flooring.
- The sprinkler pipes inside the drop ceiling will be moved to the
side wall.
|